Since our last update in April, Mirvac are pleased to share the following construction update.

The core tower structure has now reached Level 37, and the building façade has been installed up to Level 30. Apartment walls are now being constructed through the tower. Kitchens have been installed up to Level 8 and modular bathrooms have been installed up to Level 28.

Construction is continuing during Victoria's COVID-19 Stage 4 restrictions, albeit at a reduced capacity. At this current time, completion is anticipated for Spring 2021 however if restrictions are on-going this timing may be impacted.

Watch the time lapse video above to see Voyager coming to life.


Voyager will be the tallest building to date within the multi-award-winning Yarra’s Edge precinct, and a landmark entrance to Melbourne’s CBD from the Bolte Bridge.

With one, two and three bedroom apartments across 43 levels and the first ever rooftop lifestyle space in the precinct, Voyager will provide residents with luxury, elevated living.